![]() ![]() Make certain there is no foreign material which can be drawn into or blown through the fan or ductwork.Įyes should be protected against undetected foreign material through the use of safety goggles or other appropriate means. Method Statement For Ation Of Air Handling Unit Free Flow OfĪdd water in condensate drain pan to prime the trap and ensure free flow of water into the drain.Įnsure that minimum water levels are maintained in electrical pan humidifier air washers.ĪHU Fan Start-up Method Statement Screw out security nuts if spring mounts the unit.Ī complete inspection shall be made of all ductwork and the interior of the fan. Remove all filters including panel filters: install low efficiency filters such as gauze bags or a set of throw away type filters.Įnsure that all the air in the system and coil is vented out. ![]()